
Key takeaways
- The Public Procurement Act is gone. On 17 September 2026 the Constitutional Court unanimously declared the 2024 Act invalid because Parliament failed to allow proper public participation.
- The old rules still apply. The Act never came into force, so the PFMA, the MFMA, the PPPFA and its 2022 regulations continue to govern every tender.
- Tembisa shows how the fraud works. Investigators say syndicates split purchases below R500,000 and used fake quotes to skip open tenders, draining about R2 billion.
- Reform will return. The Finance Minister has said Treasury is going “back to the drawing board” for a new procurement act.
How South Africa’s tender system got here
Under apartheid, government buying ran through a centralised State Tender Board that delegated authority to departments and state companies. Large, long-term contracts flowed to a narrow circle of established firms, and small or black-owned businesses had little chance to break in.
After 1994, reform was a priority. In 1997 the Finance Ministry and the Department of Public Works published a Green Paper on Public Sector Procurement Reform. It proposed decentralising buying, splitting large contracts so smaller firms could compete, and creating a national office to police the rules. The Preferential Procurement Policy Framework Act of 2000 then introduced the 80/20 and 90/10 systems: most of the score for price, the rest for preference goals tied to black economic empowerment.
The weak point was oversight. Buying was decentralised long before a strong central regulator existed; the Office of the Chief Procurement Officer was only set up in 2013. Into that gap stepped the tenderpreneur: a politically connected person who wins contracts without the capacity to deliver, subcontracts the work for a fraction of the price and keeps the rest. The model peaked in the state capture years, when the Zondo Commission documented how state companies such as Eskom and Transnet were steered toward connected suppliers.
What the court struck down, and why
South Africa’s public sector buys about R1 trillion a year, roughly 15% of GDP. The Public Procurement Act of 2024 was meant to replace the patchwork with one framework for every organ of state. It would have replaced the PPPFA, the State Tender Board Act and the supply chain rules in the MFMA, and created a Public Procurement Tribunal for bidder complaints.
Treasury published draft regulations on 16 April 2026 and extended the comment period to 15 July. In August, Parliament introduced an amendment bill that would have removed the Act’s provisions on set-asides, prequalification, subcontracting and designated sectors.
Then the challenges landed. The Western Cape Government, the City of Cape Town and the trade union Solidarity took the Act straight to the Constitutional Court, with the investigative journalism centre amaBhungane joining as a co-applicant. The court found that a new chapter was added between drafts without being put to the public. Parliament had not met its duty to facilitate reasonable public participation. That finding was enough to strike down the whole Act, so the court never ruled on what the Act actually said. Finance Minister Enoch Godongwana said the government would keep using the existing statutes while Treasury prepares a new act.
What has not changed for bidders
- The PFMA governs national and provincial departments and public entities.
- The MFMA and each municipality’s supply chain management policy govern local government.
- The PPPFA and its 2022 regulations govern preference points, which each organ of state ties to its own specific goals, with B-BBEE status the most common.
- eTenders remains the national publication portal, alongside provincial portals and the bid pages of state companies such as Eskom and Transnet.
Commentators warn that national bodies must keep juggling separate frameworks and preference scorecards. The fragmentation the Act was meant to fix is still there.
See today’s live opportunities
Browse the live board free, no login. Full details, documents and source links from US$2 a month.
Tembisa and Digital Vibes: two case studies
Tembisa Hospital in Gauteng became the clearest recent example of procurement capture. The Special Investigating Unit says it identified three major syndicates that misappropriated about R2 billion meant for healthcare. Suppliers were appointed with fraudulent documents through a manipulated three-quote system, and each transaction stayed under R500,000 so it never had to go to open tender. The SIU says corrupt payments to health officials totalled about R122 million.
One alleged syndicate leader is linked to at least 75 companies, 73 of which were irregularly appointed at the hospital. In September 2026 the SIU secured a preservation order over about R42.4 million in cash and assets linked to alleged bribes, and in July a court granted a final forfeiture order over R326 million in assets of another businessman. Arrests continued into November. The accused have not been convicted, and the cases are before the courts. Babita Deokaran, a senior Gauteng health finance official who flagged irregular payments at Tembisa, was shot dead outside her home in August 2021.
The earlier Digital Vibes case shows the same pattern at national level. Between 2020 and 2021 the national Department of Health awarded a communications company about R150 million in contracts for COVID-19 and health insurance awareness. The SIU found the contracts irregular and reported that money flowed to people close to the then health minister, who resigned in August 2021 and has denied wrongdoing.
What honest bidders should do now
- Bid under the current rules with confidence. There is no legal gap. Read each tender’s preference point system and specific goals.
- Keep your registration and compliance documents current. Most organs of state require registration on National Treasury’s Central Supplier Database, a valid tax compliance status and B-BBEE evidence.
- Treat repeated small quotes as a warning sign. If a buyer keeps asking for quotes just under a threshold for work that is clearly one project, that is the Tembisa pattern. Keep your records clean.
- Partner where preference points decide. For firms from elsewhere in Africa, a joint venture with a B-BBEE compliant South African firm is often the only realistic way to compete on points.
- Use your remedies. Until a tribunal exists, challenges go through the organ of state’s own objection process and the courts. Act fast and keep every document.
What to watch in 2027
- A new procurement bill, with a fuller consultation process. Treasury’s appetite for reform has not dimmed.
- Treasury instructions. Treasury can tighten procurement practice through instructions and regulations that do not need a new act.
- Recoveries and prosecutions. The Tembisa cases will test whether looting carries consequences. Corruption Watch notes that South Africa’s CPI score has stagnated at historic lows.
- Lessons from abroad. Systems such as Singapore’s GeBIZ and South Korea’s KONEPS run every step on one platform and publish who won and at what price. Botswana built a central regulator and a single supplier system next door.
Where VeriAfrica fits
VeriAfrica tracks South African tenders next to opportunities in dozens of other African markets, and helps firms from across Africa see which South African tenders they can realistically win. Matchmaking connects foreign bidders with vetted local partners when preference points decide the outcome. The Verified badge gives buyers and partners a human-checked view of your business. Ask GOMAT, the in-app AI tender advisor, how a specific tender’s points will be scored.
Sources
- TimesLIVE, ConCourt says Public Procurement Act is invalid, 17 September 2026; EWN, law declared unconstitutional
- TimesLIVE, “Back to the drawing board”, Godongwana says; SAnews, Minister notes the judgment
- Moonstone, What happens to the reform now?; BusinessTech, new tender laws invalid; Cliffe Dekker Hofmeyr, reflections on the judgment
- Business Day, Claire Tucker on the process failure and Vuyo Ninzi on the regulatory vacuum
- Pinsent Masons, reform and the infrastructure sector; SAnews, comment period extended; Parliamentary Monitoring Group, Public Procurement Amendment Bill B22 of 2026
- SIU, Tembisa Hospital interim report and Syndicate X preservation order; SAnews, freezing order
- EWN, final forfeiture order and former employees in court, 17 November 2026
- Corruption Watch, CPI 2025: South Africa unchanged; OECD, Competition and corruption in public procurement: note by South Africa
- History of the tender system, Digital Vibes case and the Singapore, South Korea and Botswana comparisons: video transcripts supplied by the author; public record of the 1997 Green Paper, the PPPFA of 2000 and the SIU’s Digital Vibes findings
Get every African opportunity in your language
Tenders, grants, jobs and scholarships from 50+ African countries, translated and filtered for you. Browse free, full details from US$2 a month.



